Skip to content

Product selection

XGY Advisor

Product and model selection

Choose an application, compare product specifications and model options, and add your selected configuration to an RFQ brief.

Selection setup

Define your application

Product category
Example project
Power Supplies · Applications loaded, 3 candidates shown.

Bidirectional · 800–1,000 V · 30 kW continuous · SCPI/LAN · Production validation

Compare shortlisted products

Requirement
N355 SeriesRecommended
N351 Series
N362 Series
Energy flowMeets requirement

N351: Dual-quadrant source and load with grid energy return.

Outside requirement

N362: Source-only operation; regenerative sink operation is not included.

Voltage envelopeOutside requirement

N351: 40 V and 80 VDC model families. Below the 1000 V requirement.

Meets requirement

N362: 20–1,500 VDC model families. Covers the 1000 V requirement.

Continuous powerOutside requirement

N351: 2.5–7.5 kW in a 1U chassis. Below the 30 kW requirement.

Outside requirement

N362: 500 W–10 kW in 1U and 2U formats. Below the 30 kW requirement.

AutomationMeets requirement

N351: SCPI over LAN; Modbus-RTU and CANopen are also available.

Meets requirement

N362: SCPI over LAN; Modbus-RTU and CANopen are also available.

Selection note

Compact 1U regenerative platform, limited to 80 V / 7.5 kW.

Source only, up to 1,500 V / 10 kW; add a load for returned energy.

N355 Series

Recommended
N355 High Power Bidirectional Programmable DC Power Supply
Energy flow
Meets requirement

N355: Bidirectional source and sink with up to 93% energy return.

Voltage envelope
Meets requirement

N355: 360–2,250 VDC model families. Covers the 1000 V requirement.

Continuous power
Meets requirement

N355: Up to 42 kW in a 3U chassis. Covers the 30 kW requirement.

Automation
Meets requirement

N355: SCPI over LAN; Modbus-RTU and CANopen are also available.

Selection note

3U platform; the selected model pairs the voltage/current class with the facility regeneration path.

View product details

Project inputs for the RFQ

Facility regeneration path

Choose whether returned energy routes to the grid or is absorbed by a local load bank.

Needed

Grid-tied regeneration or local load bank?

Emergency-stop / interlock boundary

Define E-stop, precharge, discharge and interlock ownership across the supply, DUT and rack.

Needed

Who owns the protection and interlock boundary?